Greener soulbrain

Soulbrain complies with the low-carbon green growth management policy. In order to achieve our mid- to long-term GHG reduction targets, we will not only implement sincere reduction activities but also prepare various measures to reduce GHG emissions to keep pace with a carbon-neutral society.

ENVIRONMENTAL IMPROVEMENT GOALS

Activities and Performance

2024
  • Wastewater and Waste Reduction Performance

    MORE VIEW
  • Health Goals and Performance

    MORE VIEW
  • LCA (Life Cycle Assessment) Performance

    MORE VIEW
  • Join K-RE100

    MORE VIEW
  • Participation in Carbon Neutrality Point Green Life Practice

    MORE VIEW
2023
  • Wastewater and Waste Reduction Performance

    MORE VIEW
  • Safety and Health Performance

    MORE VIEW
2022
  • Wastewater and Waste Reduction Performance

    MORE VIEW
  • Introduction of Evaporative Concentrators

    MORE VIEW
  • Introduction of RO Facility

    MORE VIEW
  • Expansion and Advancement of the Factory Energy Management System (FEMS)

    MORE VIEW
2021
  • Wastewater and Waste Reduction Performance

    MORE VIEW
  • Reduce Water Usage

    MORE VIEW
  • Launch of the Environmental Performance Council

    MORE VIEW
  • Solar Power Generator Installation

    MORE VIEW
  • Manufacturing and Installation of Wastewater Recycling Equipment

    MORE VIEW
  • Use High-Efficiency Inverters and Replace High-Efficiency Boilers

    MORE VIEW
  • Establish the Factory Energy Management System (FEMS)

    MORE VIEW
Wastewater and Waste Reduction Performance
Category Wastewater Reduction 10% Target Waste Reduction 5% Target
2022 Achievement Rate 2022 Achievement Rate
Total 178.8% 72.0%
Introduction of Evaporative Concentrators

Additional evaporative concentration facilities (3400 tons/month) have been introduced into wastewater recycling facilities to increase wastewater reuse rates.

Introduction of RO Facility

We are implementing wastewater reduction activities by introducing a wastewater reduction facility, RO facility (3,600 tons/month).

Expansion and Advancement of the Factory Energy Management System (FEMS)

We have completed the first phase of advanced work to expand the energy management system to all factories and have completed the system installation in all major energy-consuming facilities. Through accurate measurement, we are identifying energy-intensive facilities and continuing energy and greenhouse gas reduction activities through continuous improvement.

Wastewater and Waste Reduction Performance
Category Wastewater Reduction 49.7% Target Waste Reduction 15.2% Target
2021 Achievement Rate 2021 Achievement Rate
Total 24.3% 82.7%
Reduce Water Usage

In 2021, Soulbrain's water usage reduction performance compared to the previous year was 12,855 tons. This is equivalent to the amount of water that 2,500 adults can use in a month. This is a 5.21% improvement in reduction rate compared to the previous year. In particular, 4,700 tons were reduced in the plant that produces ultra-pure water, which is essential for the production of semiconductors and display panels. In addition, we are reducing water usage by maximizing the use of eco-water and increasing water recycling. In addition, this is the result of applying various reduction items, such as improving the process of cleaning work that requires water usage and introducing equipment to improve the function of refrigerators that use water. In addition, we also reduce water usage by reusing water used once as boiler feed water. In 2021, water reduction items were shared at the environmental performance council held every month, and they are being distributed horizontally to similar process facilities. Soulbrain will make further efforts to reduce water usage through optimal water resource management.

Launch of the Environmental Performance Council

This is a council presided over by the CEO and attended by all heads of related departments. As a major agenda, we collect and report energy consumption and waste generation and share the current status of the application of major reduction items and improvement results.

Solar Power Generator Installation

It was completed in October 2021 after a period of 5 months and has been in normal operation since November. It produces an average of 18,000 kWh of electricity per month, which is used as electricity required for the manufacturing process, and a central control room monitoring system related to solar power generation has been established. The installed capacity of energy generation is over 150 kW per hour, and an average of 3.7 hours of power generation is generated per day per year. The generated energy is used as electricity required for manufacturing production at the Gongju plant.

Manufacturing and Installation of Wastewater Recycling Equipment

Regarding the treatment of all wastewater generated from the plating and surface treatment processes of the Paju plant, recycling has been increased through a purification system utilizing pretreatment filters and RO filters. In September 2021, a wastewater recycling device was manufactured and installed, and it has been applied to mass production after obtaining water quality permits and conducting test runs.

Use High-Efficiency Inverters and Replace High-Efficiency Boilers

The CMP Material Manufacturing Team, the Electrolyte Manufacturing Team, and the ultra-pure water plant achieved annual reductions of 1.7 million kWh by usinghigh-efficiency inverter equipment. In addition, steam energy was reduced by 3,000 tons compared to the previous year, exceeding the target. As a representative item, eight high-efficiency boilers were replaced and installed. In addition, integrated operation of boilers in Paju Plant 1 and Plant 2 was applied to achieve energy reductions by adjusting the number of units in operation by season.

Establish the Factory Energy Management System (FEMS)

To ensure efficient energy use, an energy management system has been established at factories 2 and 6 of the Gongju plant.

Wastewater and
Waste Reduction Performance
Wastewater Target Wastewater discharge is less than 69% of production
Waste Target Waste discharge is less than 13% of production
Result Wastewater not achieved
76%
Waste achieved
6.07%
Safety and Health Performance
Safety Goal Worker Injury Accident Rate 0
Health Goal Identification and Improvement of Illegal Elements 100%
Result Achieved
Wastewater and Waste Reduction Performance
Wastewater Target Wastewater discharge is less than 67% of production volume
Waste Target Waste discharge is less than 12.5% of production volume
Waste recycling rate 55% or more
Result achieved, wastewater [58%], waste [5.81%], recycling rate [58%]
Health Goals and Performance
Health Goal 100% on-site improvement, 95% or more protective equipment receipt management, and 100% local exhaust system inspection achieved
Result Achieved
LCA (Life Cycle Assessment) Performance

In the first half of 2024, Soulbrain Holdings MI Corporation performed LCAs on two of its products, followed by additional assessments on two products produced at the Soulbrain Gongju Plant in the second half of the year.

Join K-RE100

To establish a foundation for full participation in RE100

Participation in Carbon Neutrality Point Green Life Practice

- After purchasing QR stickers, install them in the company cafe and receive carbon neutral points from the Ministry of Environment when using a tumbler
- Implement activities to expand the use of personal tumblers instead of disposable plastic cups